Grill and Jali in Pune: Get Better Security and Aesthetics with Foot2Feet

 

 

Introduction

 

Fast-moving Pune, with its modern lifestyle and traditional values, naturally comes with an increased need for security coupled with aesthetic appeal in residential and commercial properties. Grills and Jalis have turned into twin requirements in construction, talking of protection that is woven into visual elegance. With these trends, the requirement for expert Grill and Jali services in Pune could hardly be out of need.

Foot2Feet has grown to be one of the mega providers of Grill and Jali services in Pune. In depth knowledge of local taste and groundbreaking techniques has made Foot2Feet one of the most preferred service providers for bespoke Grill and Jali solutions for homes and businesses. Be it a new installation or maintenance of already installed Grills or Jalis, every project undertaken by Foot2Feet assures added security and beauty to the property.

 

What are Grills and Jalis?

Grills are a rigid frame of metal bars that is placed to protect the windows, doors, or any other opening in an edifice. A Jali, also known as a mesh, is a decorative perforated screen that provides ventilation and privacy at the same time; it improves the appearance and provides decoration to the façade structure.

Modern Grills and Jalis in Pune come in different designs, materials, and finishes. They can be designed to blend with the architecture of a building or remain as decorative pieces on their own.

 

Significance of Grills and Jalis

Foot2Feet understands the importance of Grills and Jalis for property owners in Pune for several reasons. Below mentioned points refer to the significance.

  • Security

The basic reason behind fitting Grills to your windows is improved security of your property from unwanted elements by avoiding or restricting.

 

  • Unauthorised Entry
  • Keep away burglars and intruders
  • Give in-house inmates peace of mind

 

  • Aesthetic Value

Jalis and decorative Grills add aesthetic value to your property:

  • Adds aesthetic appeal to the whole building
  • Matches architecture style
  • Can make interesting and unique patterns and designs

 

  • Ventilation

Jalis provide proper ventilation and maintain privacy at the same time:

  • Improves the indoor air quality
  • Reduces the use of air conditioners
  • Creates a comfortable living environment

 

  • Privacy

Both Grills and Jalis offer privacy solutions:

  • Restricts the outside view carefully or directly
  • Allow natural light to enter
  • Provide a sense of personal space

 

  • Property Value

Good quality Grills and Jalis add value to your property:

  • Improves its appeal from outside
  • Extra security features
  • Attractive proposition for buyers/ potential tenants

 

Types of Grills and Jalis by Foot2Feet

Foot2Feet provides the following types of Grills and Jalis in Pune:

  • Window Grills: Safety for openings yet allowing natural light and airflow. 

 

  • Door Grills: Safety for entrance doorways.

 

  • Balcony Grills: Ensuring safety with an unobstructed view.

 

  • Staircase Grills: Safety and Style.

 

  • Decorative Jalis: Forms with detailed designs for both utility and ornamentation.

 

  • Security Meshes: Fine, strong meshes for keeping away flies and thiefs.

 

  • Laser-cut Jalis: Modern and precise for a modern touch.

 

Grill and Jali Material used by Foot2Feet

At Foot2Feet, we use various materials for grill and jali construction in Pune:

  • Wrought Iron: Durable and classic, ideal for traditional designs.

 

  • Stainless Steel: Modern look and corrosion-free.

 

  • Mild Steel: Easily customized and more economical.

 

  • Aluminum: Lightweight and requires less maintenance.

 

  • Brass: Very elite and serves for many decades without getting worn off and very good stylized jali.

 

 

Jali and Grill Design Options

Foot2Feet cares about choices for all moods and spaces:

  • Traditional Patterns: Classic Indian motifs and geometrical designs..

 

  • Modern Minimalist: Clean lines for a contemporary look and feel.

 

  • Nature-inspired: Flora and fauna in various designs and patterns.

 

  • Geometric: Bold shapes and patterns for a striking look.

 

  • Customized Designs: Tailored to client specifications and property aesthetics.

 

Grill and Jali Services in Pune by Foot2Feet

Foot2Feet is the one place in Pune for all your Grill and Jali needs:

  • Custom Design: We provide an innovative design that fits to suit space and preferences of the customer.

 

  • Quality Installation: We use the most modern techniques and high-quality materials for a durable and efficient installation.

 

  • Maintenance: Regular cleaning, fighting rust, and small repairs are included in our maintenance services.

 

  • Renovation: Upgrading the designs and materials of your existing Grills and Jalis.

 

  • Painting and Finishing: We provide a variety of color options and finishes as per your property design.

 

  • Safety Additions: We can add locks and alarms to improve the level of security for your Grills.

 

 

Foot2Feet’s Work on Installation of Grills and Jalis

Foot2Feet has a systematic way of working towards the installation of Grills and Jali in Pune:

  • Initial Consultation: We try to understand what you are looking for, what is your requirement, and how much of it can be installed in your given budget.

 

  • Site Inspection: The location where it has to be installed is visited, and any kind of issues which may arise, are recorded.

 

  • Design Phase: Custom design using 3D renderings.

 

  • Proposal and Contract: We provide you with detailed plans and cost estimates.

 

  • Material: Helping you select the materials for the project.

 

  • Fabrication: After the approval, we fabricate Grills and Jalis.

 

  • Installation: The very professional installation team sets up Grills and Jali with precision.

 

  • Finishing Touches: The application of paint or any sort of finishes is done as required.

 

  • Quality Check: Our installation is checked for safety and aesthetics.

 

  • Handover and Education: Instructions on maintenance and use are given.

 

Maintaining Your Grills and Jalis

Foot2Feet offers tips to maintain your Grills and Jalis at their best apart from the services extended. These involve:

  • Cleaning Regularly: Dust and related particles should be removed so that no compact layer develops.

 

  • Prevention of Rust: Protective coatings on metal Grills and Jali members are very necessary.

 

  • Lubrication: A lubricant applies to the moving parts of Grills and Jali to ensure smooth functionality.

 

  • Paint Touch-ups: Chips and peeling should be attended to as part of aesthetics.

 

  • Tightening and Adjustments: All fittings and fasteners are tightly secured.

 

  • Professional Inspectations: Periodic inspections by professionals to discover and initiate proper steps against any possible issues.

 

Price of Grills and Jalis in Pune

Cost of Grills and Jali's prices vary in Pune, agreeing upon different factors:

  • Size and complexity of design
  • Material
  • Installation requirements
  • Any additional features added on such as locks, special finishes

Foot2Feet offers transparent pricing and work with clients to find solutions that will fit both design preferences and budget constraints.

 

Benefits of Choosing Foot2Feet for Grill and Jali Services in Pune

  • Expertise: It holds years of experience in the installation of Grills and Jali in Pune.

 

  • Materials Used: Best materials to ensure durability and aesthetic visual enhancement.

 

  • Solutions: Custom-made designs to match your property's unique style.

 

  • Timely Delivery: We are efficient in delivering and at the same time guarantee the quality of the project.

 

  • Excellent Customer Service: We provide support throughout and also after completing the assignment.

 

  • Competitive Pricing: Charges are fair for quality workmanship.

 

  • Warranty: Standing behind our work with solid, risk-free warranty options.

 

Grills and Jalis now form part of modern living in Pune and strike a balance among security, privacy, and aesthetics. With the wish to either install new or upgrade the existing Grills and Jalis, Foot2Feet will be keen on professional services to ensure that your property is enhanced both in function and form.

Be it design, installation, or maintenance; Foot2Feet will help you have a hassle-free and fulfilling experience with Grills and Jali in Pune. After all, good design coupled with proper installation of Grills and Jali does much more than offer security; it enhances your quality of life and increases value to your property.

Opt for the best Grills and Jali services in Pune by Foot2Feet. Expertise, quality of work, and committed service make us different. Now secure your premises with aesthetic appeal using our premier Grill and Jali solutions. Your perfect blend of security and style—only with Foot2Feet!

 

Frequently Asked Questions on Grills and Jalis (FAQs)

 

Q: Does Foot2Feet provide Grill and Jali services in Pune?

A: Yes, Foot2Feet deals in designing, installing, and servicing Grills and Jalis in Pune.

 

Q: What are some of the basic benefits of having Grills and Jalis installed?

A: The basic advantages of getting Grills and Jalis installed are greater security, an overall heightened aesthetic appeal, efficient ventilation, and potentially higher property value.

 

Q: What are the types of Grills and Jalis Foot2Feet deals in?

A: Foot2Feet deals in window grills, door grills, balcony grills, staircase grills, decorative jalis, security jalis, and laser-cut jalis.

 

Q: What materials does Foot2Feet use for grills and jalis?

A: They can be made using a variety of materials: wrought iron, stainless steel, mild steel, aluminum, brass, and other such metals that are suitable.

 

Q: Can Foot2Feet create any special design of Grill or Jali?

A: Absolutely! We design special Grills and Jalis based on the taste and style of architecture or building. The customers' satisfaction is our motto.

 

Q: How does Foot2Feet ensure the quality of its installations, both for Grills and for Jalis?

A: We use high-grade materials, employ skilled craftsmen, and follow a rigorous quality check process for every installation.

 

Q: What is special about Foot2Feet Grills and Jalis?

A: High-grade raw materials, skilled craftsmen, and rigorous quality check of every installation.

 

Q: Do the Grills and the Jalis installed by Foot2Feet get serviced or maintained?

A: Yes, we do servicing in the form of thorough cleaning, rusting prevention, and repairs.

 

 

 

Q: What could be the time taken for Grills and Jalis installation?

A: It depends on the complexity of the work, but we aim to do timely installation without any kind of compromise on the quality front.

 

Q: What is the total cost of Foot2Feet's services for Grills and Jalis?

A: Competitive pricing, while continuing to work on high-quality services, is combined with working on solutions that fit the wallet.

 

Q: How does one start a Grill or Jali project with Foot2Feet?

A: Simply contact us to schedule a preliminary consultation, and we shall briefly inform you about the whole procedure from design to installation.

Uses Permissible in Green Belt Zone and River Protection Belt in UDCPR 2020

Any city in India is divided into various land use zones: Residential, Commercial, Agricultural, Industrial, etc. So, there is a restriction on the use of land under any zone. For example, You cannot build a Commercial building in an Agricultural Zone, or You cannot build hazardous or high-end Industries in a Residential Zone.

 

So here are the uses permissible in the Green Belt Zone/River Protection Belt as per UDCPR 2020 (UNIFIED DEVELOPMENT CONTROL AND PROMOTION REGULATIONS FOR MAHARASHTRA STATE).

 

This is applicable to all Planning Authorities and Regional Plan Areas except Municipal Corporation of Greater Mumbai, Other Planning Authorities / Special Planning Authorities / Development Authorities within the limit of Municipal Corporation of Greater Mumbai, MIDC, NAINA, Jawaharlal Nehru Port Trust, Hill Station Municipal Councils, Eco-sensitive / Eco-fragile region notified by MoEF & CC and Lonavala Municipal Council, in Maharashtra.

 

Rule No. 4.12 Green Belt Zone/River Protection Belt

 

 

4.12.1 The following uses shall be permissible

 

i) Agriculture

 

ii) Tree Plantation, Gardens, Public park, Landscaping, Recreational Open Space, Forestry and Nursery, etc.


iii) River front development by the Authority or any institution authorized on behalf of the Authority. 

 

iv) Development of pedestrian pathways, Jogging tracks, Cycle tracks, Boat clubs, etc.

 

v) Swimming pools, clubhouses, and recreational facilities after leaving 15.0 m. belt along the river bank and 9.0 m. from Nallahs, subject to other provisions in these regulations.

 

vi) Public toilets as per requirement.

 

vii) Recreational open space of any layout / sub-division / development proposals, if submitted along with the developable land adjoining such green belt, after leaving marginal distances of minimum 15.0 m. and 9.0 m. from rivers and Nallahs, respectively, or subject to restrictions mentioned in Regulation No.3.1.3.

 

a) The uses and their extent shall be permissible in such Recreational open space, as prescribed in this regulation.

b) If the land under the green belt zone, except open space therein, if any, is required by the Authority for the public purposes mentioned above, the owner shall hand over the possession of such land for the development and maintenance of public purposes.

Thereafter, such land shall remain open and accessible to the general public for recreational activities.

 

c) The side / rear marginal distances for a proposed building in a land adjoining a river /

nallah shall be the maximum of :-

 

(i) Side / rear marginal distance, to be measured from river/nallah, as required according to height of building or

 

(ii) 4.5 m. from the dividing line between the green belt zone and the other developable zone; or

 

(iii) Mandatory distance of 15.0 m. or 9.0 m to be observed from a river or nallah, respectively.

 

 

Related Regulations to Rule No. 4- 

 

You can visit our other blogs on regulations through the below-mentioned links:

 

Uses Permissible in Various Zones UDCPR 2020

 

Uses Permissible in Development Plan Reservations in UDCPR 2020

 

Uses Permissible in Agricultural Zone in UDCPR 2020

 

Uses Permissible in Public and Semi Public Zone in UDCPR 2020

 

Uses Permissible in Industrial Zone in UDCPR 2020

 

Uses Permissible in Commercial Zone in UDCPR 2020

 

What are the Types of Zones in UDCPR 2020

 

Uses Permissible in Residential Zones R2 in UDCPR 2020

 

Uses Permissible in Residential Zones R1 in UDCPR 2020

 

Installation of Solar Assisted Water Heating (SWH) System, Roof Top Photovoltaic (RTPV) System in UDCPR 2020

UDCPR 2020 Chapter 13 is all about the Special Provisions for Certain Buildings as per mentioned in the UDCPR 

 

This is Applicable to all Planning Authorities and Regional Plan Areas except Municipal Corporation of Greater Mumbai, Other Planning Authorities/Special Planning Authorities/ Development Authorities within the limit of Municipal Corporation of Greater Mumbai, MIDC, NAINA, Jawaharlal Nehru Port Trust, Hill Station Municipal Councils, Eco-sensitive/Eco-fragile region notified by MoEF & CC and Lonavala Municipal Council, in Maharashtra.


Rule No. 13.2 Installation of Solar Assisted Water Heating (SWH) System/Roof Top Photovoltaic (RTPV) System

 

SWH or RTPV systems shall be mandatory in all types of buildings to be constructed on a plot area of more than 4000 sq.m.

 

In order to facilitate the installation of the SWH/RTPV System, the new buildings shall have the following provisions :-

 

i) All such buildings where SWH/RTPV are to be installed will have open sunny roof areas available for the installation of SWH/RTPV.

 

ii) The roof loading adopted in the design of such a building should be at least 50 kg. Per sq.m. for the installation of SWH / RTPV.

 

iii) At least 25% of the roof area shall be utilized for installation of the SWH/RTPV system.

 

iv) Precaution should be taken that architectural elevation treatment should not cast a shadow on terrace space. As far as possible, the parapet of the south, east and west sides of the terrace shall be of railing type (above 1 foot) such that it will not cast a shadow on the solar collectors and maximum terrace space can be utilized.

 

v) All such new buildings installed with SWH shall have an installed hot water line from the rooftop and insulated distribution pipelines to each of the points where hot water is required in the building.

 

Related Regulations

 

You can visit our other blogs related to Regulations 13 through the below-mentioned links:

 

Grey Water Recycling And Reuse in UDCPR 2020

 

Rain Water Harvesting in UDCPR 2020

 

Provisions for Barrier-Free Access in UDCPR 2020

 

Solid Waste Management in UDCPR 2020

 

different types of nocs for construction you should be aware of

Know more about NOC (No Objection Certificate) for Building Construction

Every person who intends to carry out new development and erect, re-erect or make any alterations in any place in a building or demolish any building essential to obtain building permission from local planning authority. Similarly, Building permission is the No Objection Certificate for Building Construction. You can make the application for Construction Noc through registered architect or licensed engineer/ structural engineer, to the authority planning authority.

 

Click here to get free quotations on Construction NOC

 

What are the documents required for Building Permission?

To obtain construction noc, it is mandatory to submit complete information in the form with all necessary documents. Subsequently, Payment receipt of scrutiny fee and any other fee /charges needs to be attached along with the application for Construction Noc.  Below is the Checklist of documents required for building permission-

a)  Application for Building permission

    b)  Mojani map showing plot boundaries

    c)   7/12 or property card

    d)      Property Fer-Faar (Mutation Entries)

    e)      PREDCR drawing & report

    f)       Zoning Demarcation

    g)      Building drawing as per DC rules 2017

    h)      Structural stability certificate

    i)        Site supervisor Letter

     j)        Owner Registration to PMC

     k)      Tax NOC

 l)        Title & Search Report

m)   Aviation NOC (or elevation certificate)

n)      Society Allotment letter & NOC

o)      Site Photos

p)      Layout Plan (If available)

 

Procedure for Building Approval

The process involves to obtain building permission is subject to stringent scrutiny. Following are the step by step process involves in online permission-

Step 1.  Procuring all required documents.

Step 2.  Online application with Pre-dcr drawing to get Pre Approval.

Step 3. Offline file submission.

Step 4. Site visit report and order by Building Inspector

Step 5. Payment of Challan.

Step 6. Final stamp on blueprint and get Commencement Certificate.

 

 

List of Other NOC required for construction

When you make a dream of new home and opt to execute it, you enter into the pre-approvals’ stage. Many of us know how to take decisions but very few know that there is list of documentation needed for it to come in existence. Every builder and owner of the land has to give applications and documents which are required for building constructions and its clearance. Following are the list of various NOC’s requires for the construction as depends on the project-

 

a)     Fire Noc

b)     Aviation Noc

c)     Garden Noc

d)     Forest Noc

e)     Heritage Noc

f)      Road Noc

g)     PWD Noc

h)     Irrigation Noc

i)       M.O.U / Development Agreement Noc.

 

 FAQ about Building Permission-

1.     What are the various factors occurs to get noc for building?

Specifically, Various factors are involved in building permission. However it starts from  the identification and authentication of land, to check that building conforms to all the standards of safety and regulations, distance from road, distance of surrounding buildings, height of proposed construction, and any other criteria set by the local planning authorities arises time to time.

 

2.     What are the Building Rules in PCMC?

 

Click here https://pmc.gov.in/sites/default/files/DC%20Rul%202017.PDF
for PMC Building Rules DCPR 2017.

 

Click here https://www.pcmcindia.gov.in/PDF_forms/Dc_rule.pdf for PCMC Building Rules.

 

 

 

 

           3.How much time it takes to get Construction NOC?

   Generally, from the date of final application along with necessary documents to local planning authority, it takes upto 25 days or more to obtain Construction Noc or Building PermissionOne should seek this process while constructing a new building. Also it is required at time of extension, Addition of floor, Lift addition  in existing building. Remember, for any interior changes approvals are not required

 

Click here to get free quotations on Construction NOC

Projections allowed in Front and Side Margin as per UDCPR 2020

For the construction of any building, there is a restriction of floor space to be used. It is called the FSI (Floor space Index). Also, we have to provide distance from the plot boundary which is called as marginal distance or setbacks.

 

UDCPR 2020 Chapter 6 is all about Regulations for FSI & Marginal distance.

 

This is Applicable to all Planning Authorities and Regional Plan Areas except the Municipal Corporation of Greater Mumbai, Other Planning Authorities/Special Planning Authorities/Development Authorities within the limit of Municipal Corporation of Greater Mumbai, MIDC, NAINA, Jawaharlal Nehru Port Trust, Hill Station Municipal Councils, Eco-sensitive/Eco-fragile region notified by MoEF & CC and Lonavala Municipal Council, in Maharashtra.

 

Rule No. 6.7 PERMISSIBLE PROJECTIONS IN MARGINAL OPEN SPACES/DISTANCES

 

The following projections shall be permissible in marginal open spaces :-

 

(a) Projections into Marginal Open Spaces :- Every open space provided, either interior or exterior, shall be kept free from any erection thereon and shall be open to the sky, and no cornice, chajja, roof, or weather shade more than 0.75 m. wide shall overhang or project over the said marginal open spaces so as to reduce the width to less than the minimum required. However, sloping / horizontal chajja provided over balcony/gallery, etc., may be permitted up to balcony projections at a horizontal level.

 

(b) Balconies - as specified in Regulation No.9.14


(c) Ledge for Air conditioning unit as specified in Regulation No.9.5.


(d) A canopy or porch not exceeding 5 m.in length and 2.5 m. in width in the form of a cantilever and unenclosed over the main and subsidiary entrances providing a minimum clear height of 2.4 m. below the beam bottom of the canopy. The canopy shall not have access from the upper floors (above floors), for use as a sitting out place. There shall be a minimum clearance of 1.5 m, between the plot boundaries and canopy.

Provided that more than one canopy may be permitted in the case of special buildings as per requirement.

 

(e) A projection of a maximum of 30 cm. on the rooftop terrace level may be allowed throughout the periphery of the building. In case of pitched roof projection of a maximum of 45 cm. at rooftop level throughout the periphery of the building shall be allowed.

 

(f) Accessory buildings :- The following accessory buildings may be permitted in the marginal open spaces :-

 

i)  In an existing building where a toilet is not provided, a single-storeyed toilet subject to a maximum area of 4.0 sq.m. in the rear or side open space and at a distance of 7.5 m. from the road line or the front boundary and 1.5 m. from other boundaries may be permissible. The Authority may reduce 1.5 m. margin in exceptional cases to avoid hardship.

 

ii ) Parking lock-up garage not exceeding 2.4 m. in height shall be permissible in the rear corner of an independent bungalow plot. Parking lock-up garage, when attached to a main building, shall be 7.5 m. away from the road line and shall be of such construction capable of giving fire resistance of 2 hours. The area of the sanitary block and parking lock-up garage shall be taken into account for the calculation of FSI.

 

iii)  Underground suction tanks, soak pits, and wet and dry garbage separately with collection chambers, space required for fire hydrants, electrical and water fittings, underground water tanks, dustbins, etc.

 

iv)  One watchman's cabin/booth not more than 6 sq.m. in built-up area having a minimum width or diameter of 1.80 m. Cabin/booth may be allowed at every entrance and/or exit.

 

Note :- When a building abuts three or more roads, the above-mentioned uses, except (iv), shall be permissible in front setback facing a smaller road of less importance from a traffic point of view.

 

(g)  Ramp for basement in side and rear marginal distances subject to provisions under Regulation No.9.12.

 

(h)  Fire escape staircase of single flight not less than 1.2 m. width excluding the marginal distance required for special buildings.

 

(i)  Staircase mid-landing of 1.2 m. width with a clear minimum headroom of 2.1 m. below the mid-landing. However, the clear distance from the edge of the landing to the plot boundary shall not be less than 1.8 m. in the case of non-special buildings and 6.0 m. in the case of special buildings.

 

(j)  Architectural projections - Architectural projections as specified in Regulations No.9.30.

 

(k)  Construction of ottas, railings, barricades, or supporting columns for canopy or porch shall not be permitted within the minimum required front marginal distances. However, steps or steps along with otta may be permitted to project up to 1.2 m. from the building line.

 

(l)  Cupboard as specified in regulation No.9.6.

 

 

Related Regulations to Rule No.6 - 

 

You can visit our other blogs on regulations through the below-mentioned links:

 

What are the Regulations for Height of Building in UDCPR 2020

 

What is the Calculation of FSI Pline and its exemption in UDCPR 2020?

 

Industrial Building Regulations of FSI, Marginal Distances and Plot Area in UDCPR 2020

 

Regulations for Permissible FSI in Non Congested Area In Maharashtra in UDCPR 2020

 

What are the Setback, Marginal, Distance, Height in Non Congested Area in Maharashtra in UDCPR 2020

 

What are the Setback, Marginal, Distance, Height, and Permissible FSI in Gaothan or Congested Area in Maharashtra in UDCPR 2020

 

Step by Step Society Redevelopment Process


Click Below to go to Services

 

 Project Management Consultant (PMC) 

 

 Find a Builder For Redevelopment 

 

Deemed Conveyance

 

Feasibility Report

 

 Structural Audit 

 


 

Introduction

 

We understand that redevelopment is the most critical, risk-oriented process in the lifespan of society. Society members have to go through huge problems & worries during the decision-making process. But with the help of a good project management consultant, this process will reduce the worries of all members. The process must have the following factors.

  1. Maximum benefit to all society members. 
  2. Impartial service to all members. 
  3. Consultation for smooth process & easy decision-making 
  4. Safeguarding society's rights.

 

Let’s understand the whole process of redevelopment at a glance

 

For a successful redevelopment, society must go through the following process.

  1. Smooth redevelopment 
  2. Frequently asked questions(faq)
  3. Step-by-step redevelopment
  4. Redevelopment document/lists
  5. Supervision
  6. Agencies & members involved in the redevelopment process
  7. Successful redevelopment   

 

Here is each point explained in detail.                                          


 

SMOOTH REDEVELOPMENT

 

Difference between Restoration and Redevelopment?

 

In restoration, the existing building is extensively repaired and restored to its original condition. In redevelopment, the existing building is demolished, and a new structure/building with prevailing bylaws and additional FSI/TDR is constructed.

 

What Are The Advantages Of Redevelopment?

 

  1. In the case of a building's restoration by major repairs, though the beams and pillars are strengthened externally, the inner core, which consists of steel rods, cannot be restored to its original condition. Hence, even after extensively repairing the building, there are bound to be umpteen complaints about leakages requiring frequent repairs. In the case of redevelopment, the entire structure being brand new, it will be free from complaints. 
  2. The new building will accommodate various modern facilities & amenities with the current trends of society.
  3. Well-planned and designed flats with earthquake structures.
  4. The corpus fund received by each individual member will cover the increase in the premises' maintenance cost or could be utilized for other purposes.
  5. Additional carpet areas will be received as compensation from the developer. 
  6. The owner can buy additional space (if available) from the developer at the best available price.
  7. Modern facilities/amenities/gadgets like lifts, intercom systems, smoke detectors, fire fighting alarm systems, concealed plumbing, concealed wiring for electricity, telephone, cable TV, etc. Will be available. (depends upon an offer from developers)
  8. Additional parking will be available with new norms of authority.
  9. Electrical, plumbing, tiles, parking spaces & other specifications will follow modern trends.

 

Disadvantages Of Redevelopment

 

  1. For a considerable period of time, members are required to give up possession of their flats, which disrupts their age-old routine.
  2. If converted to commercial complexes, residential complexes are seldom preferred for housing purposes or dwellings.
  3. The additional areas received will attract stamp duty and registration charges at the current market price.
  4. There is always a fear of a halfway stalled project resulting in a court case. ( but a good project management consultant can reduce this risk by verifying of all steps in the redevelopment process)
  5. New construction with all kinds of amenities will increase the cost of maintenance to be paid to society. 

 

Guidelines For Smooth Redevelopment 

 

  1. All members of society should be confident in the redevelopment process.
  2. The tender process should be transparent & as per the provision of cooperative society housing bye-laws
  3. The appointment of a builder/developer/contractor should not be arbitrarily made. The agreement with them should be legally sound, technically complete, and clearly mention all possible building specifications. It should clarify all things like carpet area, amenities, corpus fund, shifting charges, rent of temporary accommodation, any betterment charges, etc.
  4. The role & responsibility of the project management consultant should be clear & their services should be impartial.
  5. Society should not go for a redevelopment process without a feasibility report from a project management consultant.

 

Frequently Asked Redevelopmenent Questions (FAQs) 

 

Q.1 Whether individual consent of all the members is required for redeveloping the society’s buildings or only a resolution by the general body will be sufficient?

 

  • In the case of the apartment (registered under the association of apartments) a written consent is required from each & every member. But in the case of housing society a written consent from 51% of members is required for redevelopment. 

(As per govt. GR)

 

Q.2 What is the consequence if consent is not received from all the members for carrying out redevelopment?

  • If all the members of the society do not give their consent for redevelopment, the concerned authorities, such as the Dy. Registrar of co-operative societies, will not grant permission for redevelopment.

 

Q.3 Can a member change his decision after giving his consent in writing for redevelopment?

 

  • Consent obtained from the members is irrevocable and embossed with rs.100/- stamp. Hence, once consent is given by a member, it cannot be revoked. Only if a member has a strong reason to retract his consent does he have to follow the legal procedure for proving his point of discontent for retracting his consent.

 

Q.4 Can a minority of members stall the process of redevelopment?

 

  • It depends on what proportion of minority is stalling the development and the reasons behind stalling the project. If the reasons for stalling the project are strong, then redevelopment cannot proceed unless the issues with them are settled.

 

Q.5 Can one or two members hold the society to ransom on flimsy grounds?

 

  • No member of the society can hold the society to ransom on flimsy grounds. The society will have to initiate action against such members.

 

Q.6 What action can the society initiate against those members who oppose such kind of a move that is supported by a huge majority

 

  • Then society can issue show cause notice to the members and take action even to the extent of expulsion from the society.

 

Q.7 Does a society require forming a redevelopment committee or can a managing committee carry out the job independently?

 

  • The general body has the power to decide on this issue. Appointing a redevelopment committee is not mandatory but is highly recommended to ensure transparency in the dealings.

 

Q.8 What are the powers of the redevelopment committee?

 

  • The general body has to decide on the powers to be allocated to the redevelopment committee. Generally, the following powers are to be given to the redevelopment committee:
  •  to approve or reject the proposal placed before them by the managing committee of the society.
  • To give suggestions, if any, regarding the proposal placed before them by the managing committee.

 

Q.9 What is the tenure of the redevelopment committee?

 

  • Generally, the tenure of the redevelopment committee should be from the start of the project to the completion of the project to ensure the continuity of the control of the project.

 

Q. 10 Whether elections are to be held for the selection of members for the redevelopment committee?

 

  • The election rules are not binding on the redevelopment committee. The general body should select it from among senior members of the society who are educated to read and understand the various documents and have an active interest in redeveloping the society.

 

Q. 11 Can a redevelopment committee/member of a redevelopment committee be terminated?

 

  • If the general body feels that a member of the redevelopment committee or the entire redevelopment committee acts to the detriment of the interests of the society and obstructs the working of the managing committee in carrying out redevelopment, then on the recommendation of the general body, the tenure of a member a redevelopment committee or the entire redevelopment committee can be terminated.

 

STEP-BY-STEP REDEVELOPMENT PROCESS FOR SOCIETIES

 

The office bearers of the society are requested to follow the following steps for redeveloping their premises successfully.

 

1. Conveyance Deed-

 

Society should reconsider redevelopment only if the society has a conveyance deed in its favor. In case the conveyance deed is not in favor of society, the process for deemed conveyance should be done by appointing an appropriate agency. 

 

2. Structural Audit-

 

When a society should consider redevelopment:

 

  1. The first step for deciding on redevelopment is a structural audit report by a structural consultant or project management consultant. This survey has to be carried out for all buildings/structures in the society plot. 
  2. The structural audit agency shall reveal the condition of buildings & suggest whether society needs the redevelopment.
  3. Without such a report, society can’t go for the redevelopment process.
  4. Even if the building is less than 30 years old (building lifespan), but structural reports suggest redevelopment rather than restoration, society can go through redevelopment. 
  5. Circulation of structural audit report-

In case of an adverse structural audit report, the society shall circulate the said report to all the members of the society within one month of receipt of such report along with their recommendations and call for the consent of all the members of the society in writing within 14 days of circulation of a report giving their opinion whether they would like to go for repairs or redevelopment. If 75% or more of the total members of the society give their consent for redevelopment to the managing committee, the managing committee will start the process of redevelopment.

 

3. Starting Redevelopment-

 

The society in which redevelopment work of the buildings is required to be undertaken, an application of requisition to hold a special general body meeting to consider and discuss the redevelopment project and suggestions on the same, is to be submitted to the hon. Secretary of the managing committee which is properly 

Elected as per the provisions of the society’s bye-laws and also constituted as per. The provisions of the Maces Act 1960. The requisition application is to be signed by not less than 1/4th of the total members of the society.

 

4. SGM for Redevelopment-

 

Upon receipt of the requisition for calling the meeting, the managing committee of the society, within 8 days of the receipt of the application, should consider the same and within a period of 1 month, the Hon. The secretary will call the general body meeting of the members of the society giving 14 clear days notice for which acknowledgment will be collected from every member and maintained in the records of the society. The quorum for the SGM shall be 3/4th of the total number of members of the society. If the quorum is not attained, The SGM shall be adjourned for 8 days. 

 

If there is no quorum in the adjourned meeting also, then the meeting shall be dissolved considering that the members have no interest in the redevelopment of the society. In such a situation, the redevelopment subject cannot be brought before any SGM for its approval for further one year.

In the meeting, 3/4th of the members present in the meeting should agree to redevelopment and then a resolution should be passed for going ahead with the redevelopment of the building and authorizing the managing committee to obtain permission from the deputy registrar of co-operative societies of their respective ward office for redevelopment. A resolution should also be passed authorizing the managing committee to obtain quotations from experienced architects/project management who are impaneled by government/local authorities, for the work of preparing feasibility reports and framing rules/conditions for their work.

 

5. Permission for Re-Development-

 

The society shall forward a copy of the structural audit report along with an extract of the re-development resolution passed in the SGM to the dy. Registrar of co-operative societies of their respective ward seeking permission for re-development of their building. (As per GOVT. GR Dy. Registrar permission is no longer required)

 

6.  Redevelopment Feasibility Report-

 

Within one month from the date of receipt of permission for re-development from the office of the day. Registrar of co-operative societies, the society should appoint an architect or a project management consultant to survey the project plot/area/FSI/TDR/PMC–rules applicable/technical/financial details including viability, comparison of repairs v/s re-development and submit a feasibility report. This feasibility report should be circulated to all the members of the society within one month from the date of receipt of the report along with the managing committee’s views and their opinions/objections on the same should be called for in writing for discussion in the next special general body meeting.

 

 

7.  SGM for Constitution of Re-Development Committee-

 

  1. The society should call for an SGM and since this is an important meeting the quorum for the meeting shall be at least 75% of the members of the society. 
  2. The managing committee should discuss the feasibility report in the meeting and if at least 3/4th of the members present in the meeting agree for re-development
  3. Then they should pass a resolution to go for re-development of the building and authorize the office bearers to start the procedure to appoint an architect/civil engineer/financial consultant or project Management consultant.
  4. In the same meeting, the society should form a “re-development committee” of at least 5 prominent/senior/original members of the society representing each building of the society, to oversee the working of the managing committee

 

8.  Appointment of Consultants-

 

The office bearers shall shortlist the architect/civil engineer/ financial consultant/project management consultant for an appointment and recommend their names to the re-development committee to confirm their choices and fees chargeable by this professional/s. The managing committee should call for an SGM and introduce these professionals to the members of the society and give their recommendations. A decision should be taken in this meeting to appoint any or all them of them and fix their duties and fees.

 

9. Pooling Of Documents for Re-Development-

 

The society should ask the appointed consultant/s to proceed and go ahead to get all the clearances required for re-development and submit his report on the availability of the following documents with the society:

 

  1. Society registration certificate
  2. 7/12 extract/index ii / form no. 6 from the revenue office
  3. Conveyance deed
  4. Non-Agricultural (NA) order
  5. Property card /
  6. City survey plan (demarcation)
  7. Copy of commencement certificates
  8. Copy of completion certificates
  9. Proof of payment of stamp duty/registration charges.
  10. Copy of paid assessment bill ( water bill, electric bill)
  11. Approved building plan
  12. Structural Drawings.

 

10. Tender Floating-

 

After the technical problems are sorted out, the society should call for a SGM no. 4 to apprise the members of the society’s standing on the various technical points referred to above and convey their views as well as the views of the re-development committee on the matter and seek the approval of the general body to proceed further. In this meeting, all the members of the society should be asked to prepare and submit details of requirements/demands/choices/demands in writing so that the same could be incorporated into the tender document. The general body should pass a resolution and authorize the managing committee to proceed ahead and float tenders by inviting different agencies/builders/developers to give their offers through newspaper notices etc.

 

11. Opening Of Tenders-

 

Within one week from the last date for receipt of tenders, the society should call for an SGM no. 5 and open the tenders in front of the members of the society present in the meeting along with the society’s consultants and parties participating in the Tender. The details of offers received should be read out in the meeting and a provisional merit list should be made in the meeting itself.

 

12. Comparison Statement-

The consultants appointed by the society should study the tender offers in detail and prepare comparative charts and give their recommendations to the managing committee who should satisfy themselves about the recommendations of the consultants and put it up before the re-development committee for their observations. The best offer should be short-listed merit-wise and details circulated to all the members of the society calling for their views.

 

13. Selection Of Developer / Builder-

 

The society should call for a SGM no. 6 and after discussing the merits and demerits of all the offers, should select one developer/builder to carry out the redevelopment of the society. In this meeting, the members should agree on the following issues

  1. The additional area that they should get as not only in terms of percentage increase in their existing carpet area but also in actual number of square feet.
  2. The amount of corpus payable to each member should be clearly expressed in amount of rupees besides linkage to their existing carpet area. The break-up and the due dates for payment of the same should also be clearly specified.
  3. The amount of rent payable for alternate accommodation should be clearly specified in terms of amount of rupees besides linkage to the existing carpet area. The break-up and due dates for payment of the same should be clearly specified.
  4. The amount of shifting charges and the re-shifting charges should be specifically stated.
  5. The members should pass a resolution authorizing the managing committee to issue a letter of intent to the developer subject to the above terms and conditions.

 

14. Letter Of Intent-

 

The society should circulate the agreed terms and conditions to all the members of the society and obtain an irrevocable letter of consent addressed to the society, the builder, PMC, dy. Registrar of co-operative societies and other concerned parties. When at least 90% of the members give consent letters to the society, the society should give a letter of intent to the selected developer/builder and request him to furnish plans of the new buildings to be constructed, amenities to be provided, and allotment of flats to members as per the new plan.                    

 

                                

15. Re-Development Agreement-

 

On receipt of the plan for the new buildings, the managing committee and the re-development committee members should first approve the same and satisfy themselves that the same is as per their offer. Then, the society should call for a SGM no. 7 for approving the plan of the flats/building and amenities offered by the builder. When the same is approved in the general body, the society should pass 

A resolution to sign a redevelopment agreement with the developer also fixes the date for vacating the old flats and receiving the compensations.          

                                         

 

16. Handing Over The Property For Re-Development-

The developer should then proceed to get the plans approved and obtain i.o.d. From p.m.c. After fulfilling the terms mentioned in the i.o.d., the developer should obtain a commencement certificate up to the plinth. After these conditions are complied with, the society should call SGM no. 8 and pass a resolution for vacating the flats and fixing a date for handing over the vacant possession to the developer and fixing dates for receiving compensation from the developer. The managing committee should issue instructions to the members to vacate their flats by signing individual agreements with the developer and after receiving his dues from the developer.

 

17. Occupation Certificates-

 

After construction of the buildings is completed, the society should follow up and ensure that the developer gives, an occupation certificate and regular water connection within 4 months from the date of handing over of the new flats to the members of the society.


SUPERVISION

 

Either a Project management consultant or a separate agency must be appointed for supervision. This supervision includes many things but a few of them are mentioned below.

  1. Analysis & approval for architecture plan.
  2. Obtaining, checking & approval of drawing.
  3. Checking parking area, carpet area, society utility & service areas, etc.
  4. Structural drawing checking.
  5. Analysis & approval for submission drawing.
  6. Analysis & approvals for site execution drawings.
  7. Site visits to verify specifications, & material quality committed by the developer. (as & when required.) 
  8. Consultations throughout the redevelopment process at every important situation.

 

REDEVELOPMENT DOCUMENTS/LISTS

 

For the successful completion of the redevelopment, the office bearers of the society should be aware of the documents to be kept ready and the documents to be obtained from the builder

 

Important documents required for Redevelopment

 

  1. Society registration certificate.
  2. 7/12 extract.
  3. Conveyance deed.
  4. Title search report.
  5. Index ii
  6. N. A. Order
  7. City survey plan.( demarcation plan)
  8. Approved building plan.
  9. Commencement certificate.
  10. Occupation certificate
  11. Appointment letter to PMC.

 

Documents to be prepared for Redevelopment

 

  1. Feasibility report.
  2. Suggestions from members.
  3. Public notice for inviting the tender.
  4. Minutes of various meetings.
  5. Correspondence with different authorities.
  6. Obtaining permission from the deputy registrar.
  7. Tender form.
  8. Summary of tenders received.
  9. Approval of tenders in the general body meetings and preparation of draft and final minutes.
  10. Appointment letters to advocates, structural engineers, architects, project management consultants, etc.

 

Various Agreements & letters are required for Redevelopment

 

  1. Redevelopment agreement.
  2. Format of bank guarantee from the builder.
  3. Power of authority from the society to the developer.
  4. Agreement for alternate accommodation.
  5. MOU between the society and builder/developer.
  6. Appointment letter from the society to the builder/developer.
  7. Revocation/cancellation of power of attorney.
  8. Other duties associated with an advocate 
  9. Possession letter from the builder to the members.
  10. Format of the resolution to admit new members.
  11. List of documents required to be collected from the builder.
  12. Indemnity bond by the developer
  13. Consent letters from the members to the society.

 

What are the requirements from the Developer?

 

  1. Project report from the developer as to how they would develop the property at the offers given by them.
  2. Copy of registration certificate.
  3. Partnership deed of the developer duly registered or memorandum of association (as the case may be)
  4. Name and address of all partners/directors along with their PAN.
  5. Address & Pan of the firm.
  6. Copy of balance sheet & P/L A/C to understand the financial strength of the firm.
  7. Income tax return filed for the last 3 years of the partners/directors of the company.

AGENCIES & MEMBERS INVOLVED IN REDEVELOPMENT PROCESS

 

  1. Society members
  2. Society committee members
  3. Structural consultant
  4. Project management consultant
  5. Advocate
  6. Dy. Registrar
  7. Developer
  8. Chartered accountant 
  9. Builders architect
  10. Building permission authority
  11. New members

 

SUCCESSFUL REDEVELOPMENT

 

Must know things for successful redevelopment

 

  1. The offer received from the developer should commensurate with the potential of the plot taken for redevelopment as per the architect’s report.
  2. The builder should be strictly chosen on the basis of his financial capacity and track record and not on the basis of the highest offer received.
  3. The tenders received should be objectively evaluated by an able architect appointed by the society.
  4. All the members of the society should give their consent to avoid disputes.
  5. Complete details of the offers made by the developer should be clearly understood by all the members of the society and there should be transparency in the dealings.
  6. Redevelopment committee should be formed from amongst the other members of the society by including 2/3 members from the managing committee to oversee the entire process to ensure that complete transparency is maintained by the managing committee of the society.
  7. All agreements/documents should be got scrutinized by a competent advocate appointed by the society to ensure that there is no lacuna.
  8. A Bank guarantee for the total cost of the redevelopment project should be obtained from the developer covering the full period of construction.
  9. A penalty clause should be inserted in the redevelopment agreement to ensure proper implementation of the project by the developer.
  10. The managing committee and the redevelopment committee members should conduct regular inspections when the construction is in process to ensure that there are no deviations from the plans/offers.
  11. Existing society members should vacate their respective premises only after all necessary approvals.
  12. Any committee member or office bearer of society should not be the relative of a builder or developer. 

 

 

!! Happy redevelopment!!

 