Minimum Plot Area for Various Uses in UDCPR 2020

Mar 16, 2024

There are general regulations about any construction permissible on land and no piece of land shall be used as a site for the construction of a building if the site is not eligible for it.

 

If the Authority considers that the site is insanitary, incapable of being well-drained, or is dangerous to construct a building on it, then it is not permissible to use this land as a site for construction.


For Example, if the site is in Defense land, Railway region Hilly region, or not drained properly, in this case there, one cannot construct anything on the land without considering the regulations. This information about reservations and their use is very important when someone starts actual planning, whether they are land owners, builders, or construction owners. It is a must-know information before purchasing land or starting construction on the land.

 

This information about reservations and their use is very important when someone starts actual planning, whether they are land owners, builders, or construction owners. It is a must-know information before purchasing land or starting construction on the land.

 

UDCPR 2020 Chapter 3 is all about General Land Development Requirements.

 

This is Applicable to all Planning Authorities and Regional Plan Areas except Municipal Corporation of Greater Mumbai, Other Planning Authorities/Special Planning Authorities/ Development Authorities within the limit of Municipal Corporation of Greater Mumbai, MIDC, NAINA, Jawaharlal Nehru Port Trust, Hill Station Municipal Councils, Eco-sensitive/Eco-fragile region notified by MoEF & CC and Lonavala Municipal Council, in Maharashtra.

 

 

Rule No. 3.7 Minimum Plot Area for Various Uses in UDCPR 2020

 

The minimum plot area for various uses shall be as given in Table No.3D below:-

 

Table No.3D

Sr. NoUsesMin. Plot area (in Sq.m.)Min. Plot Width (in m.)Type of Development
1Residential and CommercialMin 30As per Table No. 6 D

Row / Semi-detached / detached development as specified / anticipated in earlier approved layout or layout to be approved in future.

In other cases, as per permissibility of the construction area taking into consideration the marginal distances.

2Plots in EWS Housing/High-Density Housing/Sites and Services/Slum Upgradation/Reconstruction Scheme by Public Authority. Row / Semi-detached / detached.
3Vehicle fuel Filling stations including LPG / CNG / Ethanol / Public Charging Stations for Electric Vehicles -
(a) Without service bayAs required by the concerned authority.As required by the concerned authority.Detached.
(b) With service bay--do ----do --Detached.
4Industrial (other than service industries)30010 m.Detached.
5Other uses (other than 1 to 4 above)Required plot size and development shall be governed by the permissibility of construction under these regulations.

 

Related Regulations to Rule No. 3 - 

 

You can visit our other blogs related to Regulations 3 through the below-mentioned links:

 

Recreational Open Spaces in UDCPR 2020

 

Provision for Amenity Space in UDCPR 2020

 

Relocation of D.P Reservations (Except Road) UDCPR 2020

 

Provision for Inclusive Housing in UDCPR 2020

 

Rules for Railway Line, River, Electric Line, Airport, Nallah in UDCPR 2020

 

Plotting, Land Subdivisions, and Access Road Rules in UDCPR 2020