Alternatives Materials, Methods of Design & Construction and Tests in UDCPR 2020

Apr 07, 2024

UDCPR 2020 Chapter 12 is all about the Structural Safety, Water supply, Drainage, and Sanitary Requirements, Outdoor Display, And Other Services in Development Plans as per mentioned in the UDCPR 

 

This is Applicable to all Planning Authorities and Regional Plan Areas except Municipal Corporation of Greater Mumbai, Other Planning Authorities/Special Planning Authorities/ Development Authorities within the limit of Municipal Corporation of Greater Mumbai, MIDC, NAINA, Jawaharlal Nehru Port Trust, Hill Station Municipal Councils, Eco-sensitive/Eco-fragile region notified by MoEF & CC and Lonavala Municipal Council, in Maharashtra.

 

Rule No. 12.3 Alternatives Materials, Methods of Design, Construction and Tests

 

1) The provision of the regulations is not intended to prevent the use of any material or method of design or construction, not specifically prescribed by the regulations, provided any such alternative has been approved.

 

2) The provision of these regulations is also not intended to prevent the adoption for architectural planning and layout conceived as an integrated development scheme.

 

3) The authority may approve any such alternative provided it is found that the proposed alternative is satisfactory and conform to the provisions of relevant parts regarding material, design, and construction and that material, method or work offered is, for the purpose intended, at least equivalent to that prescribed in the rules in quality, strength, compatibility, effectiveness, fire rating and resistance, durability and safety.

 

4) Tests : Whenever there is insufficient evidence of compliance with the provisions of the regulations of evidence that any material or method of design or construction does not conform to the requirements of the rules or in order to substantiate claims for alternative materials, design or methods of construction, the Authority may require tests sufficient in advance as proof of compliance. These tests shall be made by an approved agency at the expense of the owner.

 

5) The test method shall be as specified by the regulations for the materials or design or construction in question. If there are no appropriate test methods specified in the regulations, the Authority shall determine the test procedure. For methods of testing for building materials, references may be made to relevant Indian standards as given by the National Building Code of India, published by the Bureau of Indian Standards. The latest version of the National Building Code of India shall be taken into account at the time of enforcement of these rules.

 

6) Copies of the results of all such tests shall be retained by the authority for a period of not less than two years after the acceptance of the alternative material.

 

Related Regulations

 

You can visit our other blogs related to Regulations 12 through the below-mentioned links

 

Signs and Outdoor Display Structures in UDCPR 2020

 

Drainage and Sanitation Requirements in UDCPR 2020

 

Water Supply, Drainage, and Sanitary Requirements in UDCPR 2020

 

Building Services in UDCPR 2020

 

Quality of Materials and Workmanship in UDCPR 2020

 

Structural Safety, Water Supply, Drainage and Sanitary Requirements, Outdoor Display, and Other Services in UDCPR 2020