UDCPR has a Unified rule, which means that instead of having numerous regulations for every city/region in the state, it is better to have a single rule for all cities in Maharashtra.

But due to some geological conditions or some other restrictions the regulations may vary a bit for some regions in Maharastra. 

 

For Example, the Coastal Region, Hilly Region, Densely Populated Region, and Gaothan can't have the same type of rules, and the rules differ according to it.

 

UDCPR 2020 Chapter 5 is all about Additional Provisions for Regional Plan Areas.

 

This is Applicable to all Planning Authorities and Regional Plan Areas except the Municipal Corporation of Greater Mumbai, Other Planning Authorities/Special Planning Authorities/ Development Authorities within the limit of Municipal Corporation of Greater Mumbai, MIDC, NAINA, Jawaharlal Nehru Port Trust, Hill Station Municipal Councils, Eco-sensitive/Eco-fragile region notified by MoEF & CC and Lonavala Municipal Council, in Maharashtra.

 

Rule No.5.6 For HIngoli, Buldhana, Washim Yavatmal, Nanded Regional Plan

 

The following additional regulations shall be applicable for the development of the areas affected by the LIGO project.

 

i)  Within the distance of 15 km. from the boundary of the site, no New Railway line shall be proposed.

 

ii)  Within the distance of 5 km. from the boundary of the site, no classified roads, MDR and above, etc. shall be newly proposed. Upgradation of existing roads shall not be treated as new roads.

 

iii) Within the distance of 5 km. to 30 km., from the boundary of the site, no reciprocating activity, requiring the use of sustained heavy equipment, including mining, blasting, or such other similar activities requiring more than 20 HP power, shall be allowed.

 

iv)  Within the distance of 15 km. from the boundary of the site, no Power Plant Machinery, Rock crushers, Heavy Machinery, or Wind Mill shall be allowed. Within the distance of 5 km. from the boundary of the site, no non-reciprocating (rotating) power plant machinery and industrial machinery shall be allowed.

 

v)  Within the distance of 60 km. from the boundary of the site, no New Airport shall be proposed.

 

Note -

 

a) If any more clarification or exemption or certain information is required, then permissions shall be referred to the LIGO-India authorities (at the local office) before the final Grant of permission.

 

b) The Development Control Regulations, as amended from time to time, by the Department of Atomic Energy, Govt. of India, shall be applicable as it is for this LIGO - India Project.

 

Related Regulations to Rule No. 5 - 

 

You can visit our other blogs related to Regulations 5 through the below-mentioned links:

 

Additional Rules for Regional Plan Area than Basic UDCPR Rules in UDCPR 2020

 

Additional Regulations for Thane, Raigad, Palghar Regional Plan in UDCPR 2020

 

Additional Regulation for Ratnagiri in UDCPR 2020

 

Additional Regulations for Kolhapur in UDCPR 2020

 

Additional Regulations for Satara in UDCPR 2020

 

Additional Regulations for Raigad in UDCPR 2020

 

Additional Regulations for Solapur in UDCPR in 2020

 

Additional Regulations for Pune in UDCPR 2020

 

Additional Regulations in Aurangabad in UDCPR 2020